Capabilities reviewed.
Built to the agreed scope.
From standard FR4 to specialty materials, HDI, rigid-flex, and aluminum MCPCB projects, available fabrication and assembly capabilities are confirmed case by case after engineering review.
Assembly and test planning
- Can you place my smallest component?
- Send the manufacturer part number, package drawing and board footprint. We check the package against your layout before confirming placement.
- Will you arrange X-ray inspection?
- We arrange X-ray inspection for most projects. We agree which components or joints to inspect and what records you need when we review your board.
- How can we specify a functional test?
- You can supply a fixture or send your test method. Include the expected result so we can agree on the setup and pass/fail criteria before production.
For a documented file review, see how we checked 52 reference designators before a five-board prototype order.

Multi-layer PCB requirements reviewed for each project.
Layer count, materials, board dimensions, hole sizes, impedance requirements, and target lead time are reviewed against the project files before quotation.

HDI requirements reviewed for compact designs.
Micro-via, blind-via, buried-via, via-in-pad, trace-space, and lamination requirements are reviewed case by case based on the design files and agreed production scope.

RF and microwave material requirements reviewed by project.
Rogers, PTFE, controlled dielectric, impedance, and RF-related fabrication requirements can be reviewed against the stack-up, frequency, and customer specifications before quotation.

Flexible and rigid sections in one integrated board.
Rigid-flex construction, flex layers, bend requirements, connectors, and coating needs can be reviewed as part of a turnkey PCBA project before quotation.

Metal core PCBs for LED and high-power applications.
Aluminum MCPCB material, thermal, dielectric, thickness, layout, and shape requirements can be reviewed for LED, motor-control, and power-electronics projects.

Controlled-impedance and test requirements reviewed by project.
Controlled-impedance targets, verification method, inspection scope, and required documentation can be discussed before quotation and confirmed in the agreed project scope.
Not sure which spec fits your design?
Upload your Gerber files so our engineering team can identify open requirements and confirm the available process, inspection, documentation, and target lead time before quotation.
Upload Gerber & BOM →